Development of 990,000 square feet over eleven floors
We fabricated fifty tonnes of balustrade brackets for Google’s first wholly-owned building outside of the U.S
All 4,566 brackets and washers were custom-made in epoxy weatherproofed resin and intumescent coating, giving ninety minutes of fire protection.
The project was completed in March 2023 within a four months timeframe at a total cost of £300,000.

Soho Place/Convent Garden

Mixed-use development comprising 192,400 square feet of office space and 33,100 of prime retail space,
with a further 40,000 square feet for an IMAX cinema and offices.

Providing pre-galvanized materials for the majority of the presswork, which was powder coated to
produce a visually appealing and durable end result.

We further supplied various stainless steel and steel elements, which underwent powder coating,
anodising and galvanising processes to achieve high-quality finishes and protection against
environmental factors.

Construction took place from 2021 to the end of 2022 with a contract value of £500,000.

Imperial Aztec West, Bristol 

Commercial Glazing

Refurbishment of headquarter office building of 73,000–80,000 sq ft, including café, gym, wellness centre and other staff amenities. 

Utilising the existing framework to minimise carbon emission, we are fabricating and providing new Curtain Walls to comply with current British Standards,

Work commenced in September 2022 and is ongoing with a current spend of circa £55,000

Marketfield Way, Redhill

Mixed-use development comprising 153 studios, one- and two-bedroom flats for rental, substantial retail

space, a multi-screen cinema and adequate car parking.

We are providing a variety of aluminium presswork and steel bracketry for this project.

The project started in 2021 and is ongoing, as is our continued involvement.

Spend to date in excess of £250,000.